An independent prototype · Maumee River → Western Lake Erie

Fix the Maumee by making river recovery
cheaper, measurable, and publicly accountable.

Then reuse the operating pattern for other public problems. The Maumee is the single largest phosphorus source to Lake Erie — and it is solvable. This is an independent prototype of a public operating system — not a government body, and nothing here carries government authority.

What we're asking you to do

The details: what we would ask for later, and how you would know →

If you farm in the basin

What each practice changes on a field, and how it fits programs you already use →

The goal, and how far the river is from it

The U.S. and Canada agreed on a spring phosphorus limit for the Maumee. Spring means March 1 to July 31. One metric tonne is about 2,200 pounds.

Spring limit, total phosphorus860tonnes a year1
Spring limit, dissolved phosphorus (the part algae eat)186tonnes a year1
2008 spring load the limit was set from1,433tonnes, so the limit is a 40% cut1
Latest measured spring load, and the gapNot loaded yetHeidelberg University measures it every year. We will post the number, year and gap when we have pulled it from their data. Until then, spring loads have ranged from about 500 tonnes in a dry year to 2,100 in a wet one.2
  1. U.S. EPA, Recommended Phosphorus Loading Targets for Lake Erie (2015), under the Great Lakes Water Quality Agreement, Annex 4. Measured at Waterville, Ohio.
  2. National Center for Water Quality Research, Heidelberg University, tributary monitoring (dry year about 2012, wet years about 2011 and 2015).

The scorecard — what the team has actually done

Live from the program's own pipeline records, refreshed every 10 minutes. Honest numbers: nothing has been built yet, and the kills are published alongside the finalists — that's the filter working in public.

In the real world, so far

0projects built
0projects funded
0pilot sites chosen
Nonepublic hearing date
0public votes held

Ideas screened on paper

—proposals created
—killed or not beneficial
—in the pipeline now
—reached the final stage
—independently validated
How we filter ideas

Before a person ever looks at an idea, six AI personas, standing in for farmer and voter points of view, rate it. They are a screening tool, not votes: no human has voted on anything. They have logged — ratings so far, counting each persona once per idea per round. "Independently validated" means a second agent in this program reproduced the arithmetic; no outside party has checked any figure.

The Public Office — an independent prototype of a transparent operating system

Everything the program does is public: who works here, what they did today, how procurement will run, and where every dollar goes. Live-synced from the program's own records every 10 minutes. This is a prototype run by an independent project — not a government office.

Why the Maumee, of all rivers?

Fort Wayne's St. Joseph and St. Marys join to form the Maumee, which runs 137 miles to Toledo. It's the worst phosphorus source because four physical facts stack up with nothing breaking the chain.

  1. Biggest Great Lakes watershedLargest basin of any Great Lakes river — big basin, big load.
  2. The drained Great Black Swamp1,500 sq mi of wetland ditched and tiled away, 1859–1900. Flat, heavy clay.
  3. ~85–90% row crop on tile drainageTile delivers dissolved phosphorus — the form algae eat — fast, bypassing the soil.
  4. It empties into a shallow, warm reactorThe western basin averages ~24 ft. Warm, shallow water turns the load into a bloom.

The six levers

Farm & tile-drain runoff

The largest remaining load. 4R timing, controlled drainage, saturated buffers, two-stage ditches, blind inlets — the idea is to pay for verified pounds; no rate is set. If you farm →

Wastewater & CSO

Small share, but permittable and fast to verify. Tighten the permit; finish sewer separation.

Wetland & buffer

Rebuild the swamp's filtering function at the tile outlets that replaced it.

Legacy phosphorus

Stored P leaks for years — draw it down, don't just cut inputs.

Low terrain & flood

Point Place sits below wind-setup level; water recovery and waterfront value are one project.

Monitoring

You can't pay for pounds you don't measure. Instrument the blind spots first.

Was the river ever clear?

The toxic-bloom problem is ~125–175 years old, and it has a datable start: draining the Great Black Swamp. The western basin was never crystal-clear — it's naturally shallow and productive — but it was never toxic until we removed the swamp's filter and sped up the plumbing.

Read the full history →

The watershed's kidney

The swamp was the basin's kidney — it slowed, filtered, and released water. Tile drainage does the reverse. The durable fix is to rebuild those three jobs as thousands of small, measured, paid-for filters placed where the water now runs fastest.

7 ways to rebuild it →

The platform

Five things, one job — see the problem, watch it live, investigate the sources, and get fixes built.

Models & briefing